Franklin Roof Replacement Crew Instructions and Site Protection Requirements

Roofing crew to complete the Franklin project while following all site protection, cleanup, material handling, and installation requirements provided by the PM.

Roof Installation Roof Replacement

Complete the roofing project in Franklin with strict adherence to crew and site instructions. Crew must bring a dump trailer, wear plain shirts, and contact Nathan B. at 706.531.8767 with any questions. Protect landscaping, HVAC units, decks, pools/spas, nearby equipment, and keep all covered throughout the day. Do not park on the grass. Use ladder stabilizers at all times and remove A/C protection after demo is complete.

Installation requirements include using ice and water shield on and around all roof-to-wall areas, valleys, chimneys, and roof penetrations, installing ridge vent on all ridges, and leaving three squares on the pallet. Upon completion, clean gutters with a blower, blow off driveways, walkways, decks, handrails, and window seals, remove scuffs and tar marks from all affected surfaces, and perform a thorough nail sweep using magnetic rollers around the home, landscaping, driveways, and sidewalks.

Job Number: 932

Project Gallery

Request Quote

* Required
Your message was sent!
Thank you! We'll be in touch soon.