This project involves a complete roof replacement requiring a high-sensitivity approach to site management. The technical scope includes a full ventilation upgrade with ridge vents installed on all ridges and a reinforced secondary water barrier using Ice and Water shields on all valleys, chimneys, roof-to-wall transitions, and penetrations.
The property features a high-priority outdoor environment that requires a rigorous protection strategy:
- Aquatic Protection: A primary directive for this site is the total shielding of the pool. The crew must cover the pool with tarps and ensure all pool/spa equipment remains protected throughout the entire duration of the project.
- Property Integrity: To prevent any structural or aesthetic damage, the crew must utilize ladder stabilizers and keep all decks and A/C units covered during production. Parking on the grass is strictly prohibited to preserve the Alpharetta lawn.
- Logistics & Professionalism: A Dump Trailer is mandatory for all debris management. The crew is expected to maintain a professional appearance by wearing plain shirts and ensuring all debris is contained.
- Exhaustive Remediation: The project concludes with a meticulous cleanup protocol, including blowing out gutters, window seals, and handrails. A multi-pass magnetic sweep for nails is required across all landscaping, driveways, and sidewalks to ensure a safe, post-construction environment.
- Final Detailing: Any tar or scuff marks must be cleaned from the house and walkways. Per the material requirements, please leave three squares of shingles on the pallet for the homeowner.
Project No: 1027