This project involves a targeted 3-square roof replacement with an emphasis on renewing the home’s primary water-shedding components. The technical scope includes the comprehensive replacement of 15 units of Aluminum Roof-to-Wall flashing and 55 units of Mill Finish Aluminum Step Flashing. Additionally, the crew will perform a professional re-flashing of the existing skylight to ensure a leak-free seal.
Ventilation management is a key component of this assignment; the crew must coordinate with the Project Manager to confirm the removal of the existing power roof vent and the potential integration of supplemental box or ridge vents. Standard high-performance waterproofing remains a priority, with Ice and Water shields required for all valleys, chimneys, and roof-to-wall transitions.
Site Management & Protection Protocols:
- Exterior Asset Protection: All decks, pools, spas, and A/C units must be fully covered and protected throughout the workday.
- Property Integrity: To preserve the Brentwood estate, parking on the grass is strictly prohibited, and ladder stabilizers are mandatory for all access points.
- Logistics & Presentation: A Dump Trailer is required on-site. The crew must maintain a professional presence by wearing plain shirts.
- Detailed Remediation: The project concludes with a multi-step cleanup: blowing out all gutters and downspouts, clearing window seals and walkways, and performing a magnetic sweep of the landscaping and driveway to ensure a nail-free environment.
- Inventory: Please leave exactly three squares of shingles on the pallet for the homeowner.
Job No: 916