This project involves a targeted 1-square roofing return to address specific sectional needs while maintaining the structural integrity of the home’s exterior envelope. The technical scope includes a full ventilation refresh with ridge vents installed on all ridges and the application of premium Ice and Water shields at all critical transition points, including valleys, chimneys, and roof-to-wall penetrations.
Site Management & Landscape Preservation:
- Landscape Protection: The crew must exercise extreme caution regarding all surrounding greenery and ornamental landscaping.
- Asset Shielding: Rigorous protection is required for all decks, pools/spas, and equipment. All A/C units must be covered during the production phase, with protection removed immediately following the tear-off to ensure unit safety.
- Structural Safety: The use of ladder stabilizers is mandatory for all structure access to prevent gutter or siding damage. To preserve the Peachtree City lawn, parking on the grass is strictly prohibited.
- Logistics & Professionalism: A Dump Trailer is required on-site. Crew members must maintain a professional appearance by wearing plain shirts and keeping an organized workspace.
- Exhaustive Remediation: The project concludes with a “white-glove” cleanup, including blowing out all gutters, window seals, and handrails. Any tar or scuff marks must be meticulously cleaned from the house and walkways.
- Safety Sweep: Multiple magnetic roller passes are mandatory across all driveways, sidewalks, and landscaped areas to ensure a 100% nail-free environment.
- Inventory: Please leave exactly three squares of shingles on the pallet for the homeowner.
Project No: 941